Description
In the heart of the village of Vernayaz and close to all amenities, this plot offers 4,800 m2 of gross floor area.
The building regulations specify RCCZ:
High density zone (3)
U density index: 0.6 (a bonus of 0.1, i.e. an index of 0.7 in the case of a neighborhood plan could be added
Zone intended for collective/group housing (individual housing not authorized)
Height 5 levels -maximum height 17.5 meters
Distance to limit 2/3 of height, minimum 3 meters
Parking: min 1 space per dwelling, 2 spaces for 60 m2 of SBPU, min. 1 visitor space per 6 dwellings, villa 3 spaces minimum
The plot is not listed in the cadastre of polluted sites.
Rhône and lateral watercourses, situation: average, no indication of depth of water table.
The plot has two accesses to communal and cantonal roads:
1) Via the easement of passage in charge of the neighboring plots giving access to the Grande Rue (main)
2) Direct access on the Chemin Champagne Vieille located at the end of the plot
The plot is crossed by the HT EOS line owned by the SBB, the latter will be buried by 2025. The relevant agreement is available on request.
Constructability analysis included in the file
The building regulations specify RCCZ:
High density zone (3)
U density index: 0.6 (a bonus of 0.1, i.e. an index of 0.7 in the case of a neighborhood plan could be added
Zone intended for collective/group housing (individual housing not authorized)
Height 5 levels -maximum height 17.5 meters
Distance to limit 2/3 of height, minimum 3 meters
Parking: min 1 space per dwelling, 2 spaces for 60 m2 of SBPU, min. 1 visitor space per 6 dwellings, villa 3 spaces minimum
The plot is not listed in the cadastre of polluted sites.
Rhône and lateral watercourses, situation: average, no indication of depth of water table.
The plot has two accesses to communal and cantonal roads:
1) Via the easement of passage in charge of the neighboring plots giving access to the Grande Rue (main)
2) Direct access on the Chemin Champagne Vieille located at the end of the plot
The plot is crossed by the HT EOS line owned by the SBB, the latter will be buried by 2025. The relevant agreement is available on request.
Constructability analysis included in the file
Construction
Distribution
Conveniences
Conveniences
Proximity
- Village
- Green
- Shops/Stores
- Railway station
- Primary school
Outside conveniences
- Greenery
Distances
Distances
Public transports
320 m
Primary school
450 m
Stores
160 m
Restaurants
222 m